Yard active · Port St. Joe, FL · Lift operational Open for ASV/USV program inquiry
Welder cutting steel with a shower of sparks in the fabrication area at Gulf County Shipbuilding
Cutting — fab area 2. Shot on site. Not a render.
Secure Production · Gulf Coast · CMMC pursuit

A secure, low-visibility production environment for autonomous platform assembly.

Gulf County Shipbuilding offers a 15-acre Gulf Coast yard for ASV / USV final assembly, payload integration, and modular component fabrication — the exact profile MAP Pillar IV invites small commercial yards to fill.

POS 29.81N 85.31W
LIFT 50T · OPERATIONAL
DOCK 200FT · 12FT MLW
STATUS ACCEPTING PROGRAMS
15 acres
Working yard Gulf County Canal
200 ft
Hull construction capacity Steel · aluminum · modular
1 of 66
U.S. Shipyards Maritime Action Plan, 2026
100%
Jones Act compliant U.S.-built · keel to delivery
Property photographs

Not renders. The actual yard.

Aerial context, covered fabrication space, and the Travelift — the operating footprint behind the capability claims.

Aerial view of the Gulf County Shipbuilding yard, canal frontage, work pad, and covered workspace
Canal frontage + work areas
Covered fabrication bay at Gulf County Shipbuilding
Covered fabrication bay
Travelift on the Gulf County Shipbuilding property
Travelift on site
§ 01 — Three Missions

One yard. Three lanes of work.

We do practical shipyard work: keep the existing fleet running, build new vessels American operators need, and stand ready for the next generation of unmanned platforms the federal program of record now demands.

01 · MRO
Sustainment

Repair, refit, and dry-dock work for the working fleet.

The federal fleet faces a sustainment backlog across Coast Guard cutters, Navy auxiliaries, and NOAA vessels. Small, agile yards like ours are essential to clearing it.

  • Hull repair, steel and aluminum
  • USCG ISVS-qualified pursuits
  • Topside, machinery, propulsion
  • Coatings, blasting, paint — SSPC standards
  • Secure vessel storage — blocking & cribbing
02 · New build
Construction

Modular, distributable construction up to 1,000 tons.

Workboats, tugs, sectional barges, and ferry hulls — built modularly with CNC plasma cutting, three platen tables, and the approach the MAP calls critical for scaling capacity.

  • Steel & aluminum hulls to 200 ft
  • Truckable sectional barges
  • FERRIES Act-eligible ferry construction
  • CNC plasma cutting to 1.5″ plate
  • ABS/AWS-certified welders
03 · Autonomous
RAS-ready

Final assembly and integration for unmanned surface vessels.

The Maritime Action Plan's Pillar IV identifies modular commercial shipyards as ideal for distributed production of robotic and autonomous systems. Our facility, equipment, and workforce are ready.

  • ASV / USV final assembly
  • Payload integration & outfit
  • Secure, low-visibility production environment
  • CMMC Lvl 2 in pursuit
§ 02 — The Yard

Fifteen acres on the Gulf County Canal.

A 50-ton Travelift, three covered fabrication areas, and direct canal access — six water miles to St. Joseph's Bay and the Gulf of America.

Fig. 01 — Site plan

Gulf County Shipbuilding · Yard layout

DRG-001 · Schematic · Not to scale · Detailed blueprints on request.
Canal access 12′ MLW min · 14′–16′ dredged 85′ vert · 75′ horiz bridge clr
Travelift 50-ton Modular component handling
Fabrication Three 20′ × 40′ platens Two with windbreaks · CNC plasma
Welding ABS / AWS certified Steel & aluminum · 12 portable units
NDT in-house Andrex 300KV X-Ray + dye penetrant · five-member certified team · no third-party delays
Accommodations 16 berths on-site For owner reps, contractors, crew
Power 220V / 480V · 3-phase 6× 200A panels distributed
Heavy lift Link Belt RTC-8030 + Lull 644 material handler
Aerial view of the Gulf County Shipbuilding waterfront and equipment on the Gulf County Canal Aerial — waterfront + equipment. Shot on site 2026. Not a render.
§ 03 — Maritime Industrial Base

The federal mandate just changed.

In Q1 2026, the White House released America's Maritime Action Plan — the most comprehensive federal commitment to domestic shipbuilding in decades. Our work at GCS is exactly what the MAP calls for.

White House · Feb 2026

"With only 66 total shipyards… the United States does not have the capacity necessary to scale up the domestic shipbuilding industry."

The MAP names commercial shipyards under 1,200 production employees as critical infrastructure. We are one of them.

→ America's Maritime Action Plan, Pillar I
Bipartisan · March 2026

FERRIES Act proposes $1.35B / yr in federal ferry funding — including $240M for fleet modernization and shipyard job creation.

A concrete demand signal for new construction at small yards. We are tracking the funding pipeline and ready to bid.

→ FERRIES Act · WorkBoat coverage, March 2026
MAP Pillar IV · 2026

"RAS are relatively simple to assemble modularly — a host of commercial shipyards… can build RAS modules or perform final assembly."

A direct invitation for yards like ours. Modular footprint, skilled fabricators, low-visibility production environment, CMMC pathway.

→ Robotic & Autonomous Systems · MAP Pillar IV
< 1%
Commercial ships built in U.S.
$150B
New shipbuilding investment secured
66
U.S. shipyards · only 8 build > 400 ft
2026
MAP — most comprehensive in decades
§ 04 — Why GCS

Built for federal work, without the overhead.

Compliance pathways, skilled trades, and a Gulf-of-America footprint the MAP specifically calls out for Maritime Prosperity Zone designation.

— 01

Federal compliance ready

SAM.gov registered (UEI on file), OSHA 29 CFR 1915 compliant. Pursuing MSRA Tier 3 certification, DCAA-compliant accounting, and CMMC Level 2 cybersecurity — the qualifications the MAP recommends for expanded use of small shipyards.

SAM.gov · MSRA · DCAA · CMMC · OSHA 1915
— 02

Jones Act compliant

Every vessel constructed at GCS meets U.S.-built requirements from keel to delivery. As the administration reinforces Jones Act protections, our model is unchanged.

U.S.-built · keel to delivery
— 03

Skilled American workforce

Four-year Registered Apprenticeship with Haney Technical College and Gulf Coast State College — shipfitters, welders, marine pipefitters, marine electricians. Aligned with MAP Pillar II and Small Shipyard Grant training provisions.

Apprenticeship · ATDM-aligned
— 04

Distributable production

Three platen tables, simultaneous deck and bulkhead fabrication, no logistical drag between fab and assembly. The model the MAP recommends for scaling national capacity.

Modular · Distributable
— 05

Gulf-of-America footprint

Florida Panhandle on the Gulf of America — a region the Maritime Action Plan identifies for potential Maritime Prosperity Zone designation. Six miles from the Intracoastal Waterway.

GIWW · MPZ candidate
— 06

Autonomous & unmanned ready

Secure, low-visibility production environment for ASV / USV final assembly and payload integration. The exact profile MAP Pillar IV invites small modular yards to fill.

ASV · Payload integration
§ 05 — Leadership

Who runs the yard.

A working team — naval architecture, marine engineering, and daily production — with decades in the blue-water and Gulf Coast maritime trades.

01

John Dixon, P.E.

President & CEO · USCG Master

Strategic vision, investor relations, and federal agency engagement. 40+ years in the blue-water ocean global transportation business, with deep expertise in naval architecture, marine engineering, and project management.

02

Corey Page, P.E.

Lead Naval Architect

A licensed Professional Engineer with a strong background in naval architecture and marine engineering. Corey delivers client-focused solutions and manages complex maritime projects end to end.

03

Cauhl Cleary

Director of Operations

Oversees daily production, resource allocation, and rapid MRO turnaround across the fabrication areas and travelift.

§ 06 — Projects & Demand

Backlog of practice. Forward-looking capability.

Past delivered work alongside the demand signals we're positioned to meet — workboats, sectional barges, ferry hulls, autonomous platforms.

2024 Nekton-class small craft Aluminum · New build Hull construction, outfit, sea trials Delivered
2023 Inland tug refit Steel · MRO Hull steel, machinery, coatings Delivered
2022 Sectional truckable barge Steel · New build Modular fabrication, road-deliverable Delivered
2026 Capability sheet on request Active inquiry Detailed past performance available under NDA Available
↘ Current industry demand · what the market needs

Programs we're positioned to deliver against in 2026.

$1.35B / yr
Ferry modernization
FERRIES Act, bipartisan · 2026
USCG ISVS
In-Service Vessel Sustainment
Cutter / patrol craft repair backlog
RAS / ASV
Autonomous surface vessels
MAP Pillar IV · distributed production
Sectional
Truckable barge construction
Inland infrastructure programs
§ 07 — Inquiry

Tell us what you need built.

RFQs, RFIs, capability sheet requests, site visits, NDA-level past performance.

Yard address
1550 Old Dynamite Dock Road Port St. Joe, Florida 32456
By road
End of Old Dynamite Dock Rd Off Route 71 · 6 mi NE of Port St. Joe · 60 mi south of I-10
By water
Gulf County Canal · 6 mi From St. Joseph's Bay · 11 mi from Gulf of America
Code
NAICS 336611 Ship building & repairing